Pioneering ultra-rapid electric vehicle charging installation for independent forecourt operator
Published: 5 April 2021
We are at the forefront of the £400m investment in ultra-rapid electric vehicle charging points by independent forecourt operator MFG to be installed across 500 of its sites by 2030.
As a strategic electrical consultant partner in the initiative, we advised them technically on the design and development strategy for installation, specifying all of switch gear to be used throughout entire network.

We were on site at the pilot for around six weeks liaising with independent connection providers and network operators, manufacturers of switch gear and suppliers of the EV charging equipment.
We managed the physical installation of cables, earthing arrangements, connection testing, commissioning, emergency stop interface with the fuel system and the supply and installation of all architectural lighting.
The project was delivered on time, on schedule and is a stunning example of the forecourt of future.
More from our Knowledge Hub
- Insights
Earth Day 2025: Enabling a sustainable future while supporting today’s infrastructure in an evolving energy landscape
- Insights
Mitigating climate change risks through planned preventive maintenance
- Insights
Protective coatings: Safeguarding infrastructure against climate change
- Insights
Delivering the Water (Special Measures) Act: Supporting compliance and innovation
Environmental compliance today, creating a sustainable tomorrow
Helping you reduce risk to the environment and your operation by managing assets compliantly while achieving commercial, ESG, and net-zero goals.
Contact our experts